Skip to main content

2030 Ready: Our Colorado Clean Energy Plan

Solar panels and wind turbines

Overview

Our customers value renewable energy, and we are proud our Colorado energy supply is one of the cleanest in the state, powered 100% by natural gas-fired generation and renewable energy. In 2025 the Colorado Public Utilities Commission (PUC) approved our Clean Energy Plan, “2030 Ready,” and we are on track to power our customers’ homes and businesses with 53% renewable energy by 2030, achieving a 78% reduction in greenhouse gas emissions. This plan will add 250 megawatts (MW) of new renewable resources to our system by 2030, cost-effectively meeting the state of Colorado’s requirement calling for electric utilities to reduce emissions by 2030.

 

New renewable energy projects:

  • 200 MW utility-scale solar project to be built in Pueblo County (energy to be procured through a long-term power purchase agreement)
  • 50 MW battery storage facility to be located at the Pueblo Airport Generating Station (PAGS)


Jan. 1, 2025, billing update: The Colorado PUC approved a monthly surcharge on customer bills to help fund the Clean Energy Plan. Beginning on Jan. 1, 2025, a new line item was added on customer bills, the Clean Energy Plan Rider (CEPR). At the same time, the PUC approved a reduction in the Renewable Energy Standard Adjustment from 2% to 1.5%.

May 1, 2026, update: In compliance with Commission Rule 3613(k), the company is posting the following bid information received during the competitive acquisition process.

 Bidder nameTechnology typeNameplate capacity (MW)Storage nameplate capacity (MW)Levelized energy cost ($/MWh)Levelized storage cost ($/kWh-mo)Utility ownership optionContract term/useful lifeStorage contact term
Cloudbreak Energy Partners, LLCEnergy Storagena50na$13.39 PPA with Build Transferna18
NextEra Energy Resources DevelopmentEnergy Storagena50na$14.52 Build Transfernana
Strata Clean EnergyEnergy Storagena50na$18.30 A PPA with Black Hillsna18
Aypa Power Development, LLCEnergy Storagena50na$17.76 A PPA with Black Hillsna18
Hecate Energy, LLCEnergy Storagena50na$21.04 A PPA with Black Hillsna15
Aypa Power Development, LLCEnergy Storagena50na$26.95 A PPA with Black Hillsna18
Black Hill Electric GenerationEnergy Storagena50na$35.70 Build Transfernana
Mission Clean EnergyEnergy Storagena50na$11.25 A PPA with Black Hillsna18
Mission Clean EnergyEnergy Storagena50na$11.97 Build Transfernana
Lightsource BPPhotovoltaic150na$28.77 naA PPA with Black Hills15na
NextEra Energy Resources DevelopmentPhotovoltaic200na$33.55 naA PPA with Black Hills20na
National Renewable SolutionsPhotovoltaic200na$33.54 naBuild Transfernana
National Renewable SolutionsPhotovoltaic200na$33.96 naBuild Transfernana
National Renewable SolutionsPhotovoltaic200na$35.34 naA PPA with Black Hills15na
National Renewable SolutionsPhotovoltaic200na$36.06 naA PPA with Black Hills15na
National Renewable SolutionsPhotovoltaic200na$36.19 naA PPA with Black Hills20na
National Renewable SolutionsPhotovoltaic200na$36.71 naA PPA with Black Hills20na
Lightsource BPPhotovoltaic150na$35.20 naBuild Transfernana
JUWI Inc.Photovoltaic100na$40.89 naBuild Transfernana
NextEra Energy Resources DevelopmentPhotovoltaic200na$39.19 naA PPA with Black Hills20na
JUWI Inc.Photovoltaic100na$40.69 naBuild Transfernana
NextEra Energy Resources DevelopmentPhotovoltaic200na$41.07 naPPA with Build Transfer20na
HQCPhotovoltaic218na$39.30 naA PPA with Black Hills20na
NextEra Energy Resources DevelopmentPhotovoltaic100na$41.42 naA PPA with Black Hills20na
NextEra Energy Resources DevelopmentPhotovoltaic150na$43.97 naPPA with Build Transfer20na
Clearway Renew LLCPhotovoltaic199na$44.87 naBuild Transfernana
EDF RenewablesPhotovoltaic200na$43.31 naA PPA with Black Hills20na
EDF RenewablesPhotovoltaic200na$43.75 naBuild Transfernana
NextEra Energy Resources DevelopmentPhotovoltaic200na$47.22 naPPA with Build Transfer20na
JUWI Inc.Photovoltaic100na$48.43 naBuild Transfernana
EDF RenewablesPhotovoltaic160na$47.16 naA PPA with Black Hills20na
Clearway Renew LLCPhotovoltaic100na$49.42 naBuild Transfernana
JUWI Inc.Photovoltaic100na$51.16 naA PPA with Black Hills20na
AES Clean Energy Development, LLCPhotovoltaic160na$50.28 naBuild Transfernana
JUWI Inc.Photovoltaic100na$51.16 naA PPA with Black Hills20na
Hecate Energy, LLCPhotovoltaic206na$46.68 naA PPA with Black Hills15na
Clearway Renew LLCPhotovoltaic199na$52.21 naA PPA with Black Hills20na
HQCPhotovoltaic218na$47.77 naBuild Transfernana
AES Clean Energy Development, LLCPhotovoltaic150na$52.96 naBuild Transfernana
JUWI Inc.Photovoltaic100na$55.69 naA PPA with Black Hills20na
JUWI Inc.Photovoltaic100na$55.69 naA PPA with Black Hills20na
AES Clean Energy Development, LLCPhotovoltaic160na$55.26 naBuild Transfernana
Azimuth RenewablesPhotovoltaic100na$49.70 naBuild Transfernana
Green Solar LLCPhotovoltaic100na$54.60 naA PPA with Black Hills20na
Clearway Renew LLCPhotovoltaic100na$58.21 naA PPA with Black Hills20na
AES Clean Energy Development, LLCPhotovoltaic150na$58.13 naBuild Transfernana
Stellar Renewable Power LLCPhotovoltaic199na$57.19 naA PPA with Black Hills18na
Stellar Renewable Power LLCPhotovoltaic199na$57.55 naA PPA with Black Hills18na
Horus EnergyPhotovoltaic170na$64.71 naA PPA with Black Hills20na
JUWI Inc.Photovoltaic100na$72.19 naA PPA with Black Hills20na
JUWI Inc.Photovoltaic100na$72.19 naA PPA with Black Hills20na
Horus EnergyPhotovoltaic170na$70.41 naA PPA with Black Hills20na
Lightsource BPPhotovoltaic50na$71.77 naA PPA with Black Hills15na
Lightsource BPPhotovoltaic50na$82.37 naBuild Transfernana
NextEra Energy Resources DevelopmentPhotovoltaic plus Storage20050$27.63 $13.80 A PPA with Black Hills2018
National Renewable SolutionsPhotovoltaic plus Storage20050$32.17 $13.80 A PPA with Black Hills1515
NextEra Energy Resources DevelopmentPhotovoltaic plus Storage20050$33.64 $13.80 A PPA with Black Hills2018
National Renewable SolutionsPhotovoltaic plus Storage20050$32.58 $13.80 A PPA with Black Hills1515
National Renewable SolutionsPhotovoltaic plus Storage20050$32.82 $13.80 A PPA with Black Hills2018
EDPR NAPhotovoltaic plus Storage20050$32.56 $13.80 A PPA with Black Hills1818
National Renewable SolutionsPhotovoltaic plus Storage20050$33.14 $13.80 A PPA with Black Hills2018
NextEra Energy Resouces DevelopmentPhotovoltaic plus Storage20050$34.73 $13.80 PPA with Build Transfer2018
EDPR NAPhotovoltaic plus Storage10050$37.99 $13.80 A PPA with Black Hills1818
NextEra Energy Resources DevelopmentPhotovoltaic plus Storage20050$41.21 $13.80 PPA with Build Transfer2018
OrmatPhotovoltaic plus Storage10563$37.68 $13.80 A PPA with Black Hills2018
National Renewable SolutionsPhotovoltaic plus Storage20050$41.59 $13.80 Build Transfernana
Green Solar LLCPhotovoltaic plus Storage10050$40.64 $13.80 A PPA with Black Hills2018
National Renewable SolutionsPhotovoltaic plus Storage20050$42.49 $13.80 Build Transfernana
AvangridPhotovoltaic plus Storage7550$46.84 $13.80 A PPA with Black Hills2018
Hecate Energy, LLCPhotovoltaic plus Storage20650$51.06 $13.80 A PPA with Black Hills1515
Clearway Renew LLCPhotovoltaic plus Storage19950$58.56 $13.80 A PPA with Black Hills2018
AES Clean Energy Development, LLCPhotovoltaic plus Storage16050$59.04 $13.80 Build Transfernana
AES Clean Energy Development, LLCPhotovoltaic plus Storage16050$59.38 $13.80 Build Transfernana
Clearway Renew LLCPhotovoltaic plus Storage19950$60.81 $13.80 Build Transfernana
AES Clean Energy Development, LLCPhotovoltaic plus Storage15050$61.91 $13.80 Build Transfernana
Stellar Renewable Power LLCPhotovoltaic plus Storage19950$62.79 $13.80 A PPA with Black Hills1818
Stellar Renewable Power LLCPhotovoltaic plus Storage19950$63.10 $13.80 A PPA with Black Hills1818
AES Clean Energy Development, LLCPhotovoltaic plus Storage15050$67.15 $13.80 Build Transfernana
US SolarPhotovoltaic plus Storage102.5$58.21 $6.90 A PPA with Black Hills2018
Stellar Renewable Power LLCPhotovoltaic plus Storage25050$65.68 $13.80 A PPA with Black Hills1818
US SolarPhotovoltaic plus Storage63$62.82 $6.90 A PPA with Black Hills2018
Stellar Renewable Power LLCPhotovoltaic plus Storage25050$70.26 $13.80 A PPA with Black Hills1818
US SolarPhotovoltaic plus Storage42.5$65.06 $6.90 A PPA with Black Hills2018
US SolarPhotovoltaic plus Storage32$68.29 $6.90 Build Transfernana
US SolarPhotovoltaic plus Storage42.5$70.62 $6.90 Build Transfernana
US SolarPhotovoltaic plus Storage63$70.86 $6.90 Build Transfernana
Clearway Renew LLCPhotovoltaic plus Storage199100$66.34 $6.90 A PPA with Black Hills2018
Clearway Renew LLCPhotovoltaic plus Storage199100$53.37 $6.90 Build Transfernana
Mission Clean EnergyPhotovoltaic plus Storage14050$24.64 $13.80 A PPA with Black Hills1818
Mission Clean EnergyPhotovoltaic plus Storage14050$44.53 $13.80 Build Transfernana
US SolarPhotovoltaic plus Storage102.5$75.48 $6.90 Build Transfernana
US SolarPhotovoltaic plus Storage32$81.39 $6.90 A PPA with Black Hills2018
NextEra Energy Resources DevelopmentWind150na$46.57 naA PPA with Black Hills20na
NextEra Energy Resources DevelopmentWind200na$51.38 naA PPA with Black Hills20na
NextEra Energy Resources DevelopmentWind200na$52.19 naA PPA with Black Hills20na
NextEra Energy Resources DevelopmentWind101na$57.95 naA PPA with Black Hills20na
NextEra Energy Resources DevelopmentWind101na$58.81 naA PPA with Black Hills20na
NextEra Energy Resources DevelopmentWind100na$58.59 naA PPA with Black Hills10na
NextEra Energy Resources DevelopmentWind200na$58.59 naA PPA with Black Hills10na
NextEra Energy Resources DevelopmentWind115na$69.61 naA PPA with Black Hills20na
NextEra Energy Resources DevelopmentWind115na$70.43 naA PPA with Black Hills20na


 

Highlights of our 2030 Ready plan:

  • 78% reduction in greenhouse gas emissions by 2030 based on 2005 levels
  • 53% of our customers’ electricity generated by carbon-free sources by 2030
  • 250 MW of new renewable resources, including solar and battery storage
  • Opportunities for customers to save money as renewable energy reduces generation costs

 

Frequently asked questions

What factors were considered in the “2030 Ready” planning process?

The resource planning process was grounded in our commitment to our customers and the steps necessary to provide them with safe, reliable and cost-effective energy in the near- and long-term. Through extensive analysis and modeling, we arrived at a preferred generation portfolio to meet our customers’ energy needs, while cost-effectively achieving the state’s emissions reduction requirements.

How will Black Hills Energy achieve the required emissions reduction?

Our 2030 Ready Plan will add 250 MW of new, utility-scale, clean energy resources, including solar and battery storage. With these additional resources on our Southern Colorado system, we will achieve a 78% emissions reduction by 2030.

How is this being paid for?

Black Hills Energy is leveraging $150 million of tax benefits over 10 years through the federal Inflation Reduction Action. 

What percentage of renewable energy will be on your system in 2030?

As a result of our 2030 Ready Plan, about 53% of our customers’ electricity needs will be powered by renewable energy by 2030.

Where will the renewable energy come from?

The new renewable energy resources will come from two projects — a 200 MW utility-scale solar project to be built in Pueblo County and a 50 MW battery storage facility to be located at our Pueblo Airport Generating Station. 

When will the new renewable energy be placed into service?

The new renewable energy resources will be added to Black Hills Energy’s Southern Colorado system by 2030. 

Will all this renewable energy on your system affect system reliability?

No. Our ability to serve our customers with 53% of their power supplied by renewable energy by 2030 is possible in large part due to the flexibility provided by the Pueblo Airport Generating Station (PAGS). The power supplied by PAGS, our modern, highly efficient natural gas-fired generating station, is critical to this effort. Because of the intermittent nature of renewable energy-based generation — meaning, the wind doesn’t always blow, and the sun doesn’t always shine — we must have a consistent source of generation available to be dispatched at all times. PAGS is the most efficient means of maintaining reliable service to our customers, 24 hours a day and 7 days a week.

Does your 2030 Ready plan signal a change in the way you operate in Colorado?

Not at all. Leadership in emissions reduction is nothing new for Black Hills Energy in Colorado — we retired our last Colorado coal plant in 2013, becoming the first electric utility fleet in the state to be coal-free. Since 2013, we have replaced emission-intensive coal plants with lower emission natural gas generation, wind generation, and solar generation, while maintaining system safety and reliability. Our 2030 Ready plan was built upon years of phased-in renewable generation developments that resulted in our energy supply being one of the cleanest in the state, powered 100% by natural gas and renewable energy.