The Black Hills Energy service areas are located along long-haul fiber routes that cross the central US from the major east coast markets to the west coast.

Best-in-class reliability

We deliver electric service reliability that ranks among the best for all utilities in the country,

  • All three of our electric utilities deliver industry-leading, top quartile reliability performance. This is made possible by the outstanding performance of our generating plants and power delivery systems, especially during periods of high customer demand.
  • We operate electric utilities in Colorado, Montana, South Dakota and Wyoming, serving approximately 212,000 customers’ energy needs with nearly 1 gigawatt of electric generation and a 9,000-mile electric transmission and distribution system.

Cheyenne

Positioned at the intersection of one of two fiber routes that cross the Rockies, Cheyenne sits astride an unparalleled convergence of regional and transcontinental fiber optic cables. Much of metro Denver’s digital traffic enters national backbones at Cheyenne and multiple national carriers have a point of presence in Cheyenne.

Large Power Contract Service (primary provisions):

  • New load (new customer or growing customer) of 13 MW or greater
  • Customer-owned, utility-dispatched generation capacity on-site to provide back-up service to the customer’s load and maintain reliability
  • Negotiated contract that provides access to market energy and is not served from utility-owned generation

Blockchain Interruptible Service (primary provisions):

  • New load (new customer or growing customer) of 10 MW or greater
  • Willingness to accept some degree of interruption
  • Negotiated contract that provides access to low cost energy

Pueblo

Located at the intersection of the north-south long-haul fiber route that runs along the Colorado front range, this route goes south to Albuquerque / El Paso and southwest to Dallas and Oklahoma City. Long haul fiber traffic travelling east-west will traverse through these areas with Denver being the primary intersecting point in the region.

Competitive rates and innovative tariffs

In 2018, the State of Colorado passed legislation empowering the Public Utilities Commission (PUC) to authorize applications by electric utilities to implement economic development rates. The legislation allows the Commission to approve, and electric utilities to implement, lower economic development rates for commercial and industrial users who locate or expand their operations in Colorado by at least 3 MW.

 

Learn more about how we can support your data center now and into the future.